Keller Independent School District Proposition E
Keller Independent School District, Texas
My vote power
High
Election date
November 3, 2026
How do we calculate my vote power?
What goes into the rating for ballot measures: Representation: how much weight one vote carries here compared with a statewide vote — the smaller the district, the more each vote counts. You have more power in ballot measures because you vote directly on the policy.
Representation: High · 73 out of 100
This district is a small slice of its state, so each vote here carries much more weight than a vote in a statewide race. About 186,847 people live here.
Show the representation math
score = 50 + 50 × ln(state population ÷ this district's) ÷ ln(50,000) = 50 + 50 × ln(30,188,424 ÷ 186,847) ÷ ln(50,000) = 73.5, measured against a statewide vote in TX (grades: 66+ high, 55+ above average, 33+ average, otherwise low; a statewide race is the 50 baseline)
High representation + a direct vote on the policy → My vote power: High.
Ballot Measure
Supports: Public Education Quality, Public Infrastructure
Keller ISD Proposition E would authorize $23,913,963 in bonds to design, construct, renovate, improve, acquire, and equip athletic facilities by installing artificial turf at high school baseball and softball facilities and middle-school competition fields. Property taxes would repay principal, interest, and related credit-agreement costs.
A YES vote means
The district could issue up to $23,913,963 in bonds for the specified artificial-turf projects and levy property taxes sufficient to repay them.
A NO vote means
The district would not receive voter authorization to issue these bonds or levy the associated repayment tax for the artificial-turf projects.
Sources: meetings.boardbook.org · kellerisd.net2
Source: kellerisd.net