Keller Independent School District Proposition A
Keller Independent School District, Texas
My vote power
High
Election date
November 3, 2026
How do we calculate my vote power?
What goes into the rating for ballot measures: Representation: how much weight one vote carries here compared with a statewide vote — the smaller the district, the more each vote counts. You have more power in ballot measures because you vote directly on the policy.
Representation: High · 73 out of 100
This district is a small slice of its state, so each vote here carries much more weight than a vote in a statewide race. About 186,847 people live here.
Show the representation math
score = 50 + 50 × ln(state population ÷ this district's) ÷ ln(50,000) = 50 + 50 × ln(30,188,424 ÷ 186,847) ÷ ln(50,000) = 73.5, measured against a statewide vote in TX (grades: 66+ high, 55+ above average, 33+ average, otherwise low; a statewide race is the 50 baseline)
High representation + a direct vote on the policy → My vote power: High.
Ballot Measure
Supports: Public Education Quality, Public Infrastructure
Keller ISD Proposition A would authorize $756,300,896 in bonds to design, construct, renovate, improve, acquire, and equip school facilities. The official order includes districtwide safety and security upgrades, capital improvements, replacement of mechanical, electrical, plumbing, and HVAC systems, and technology network, infrastructure, and equipment. Property taxes would repay principal, interest, and related credit-agreement costs.
A YES vote means
The district could issue up to $756,300,896 in bonds for the specified school-facility, safety, building-system, and technology improvements and levy property taxes sufficient to repay them.
A NO vote means
The district would not receive voter authorization to issue these bonds or levy the associated repayment tax for the Proposition A projects.
Sources: meetings.boardbook.org · kellerisd.net2
Source: kellerisd.net