Skip to content

Mike Gaskins

CA · Director, El Toro Water District

Official website

Mike Gaskins is an El Toro Water District director trained in marine biology and geology, with 40-plus years as an educator, chemist, labor negotiator, and human resources director. He says he will keep the district's water clean and safe while keeping costs down.

Where Mike Gaskins stands, based on their records

Supports

Environment and Public Health (4 records), Government Efficiency (6 records), Public Infrastructure (14 records)

Mixed record

Cost of Living Reduction (1 support · 1 oppose), Government Spending Reduction (3 support · 7 oppose)

Track record

Track record — Environment and Public Health

Environment and Public Health · 4 support
  • Proposed adopting the 2025 Urban Water Management Plan and supported the updated shortage plan and enforcement ordinance. Each measure passed 5-0. The shortage plan covered emergency responses, monitoring, communication, and enforcement.

    June 25, 2026Supports Environment and Public Health

    Source: etwd.com

  • Voted 5-0 for updated rules preventing dirty water from flowing back into drinking water pipes. The plan required site surveys and backflow protection at shared commercial meters.

    June 26, 2025Supports Environment and Public Health

    Source: etwd.com

  • Voted 5-0 to support SB 454’s statewide fund addressing PFAS contamination in water and wastewater systems. The vote also backed a coalition letter.

    March 27, 2025Supports Environment and Public Health

    Source: etwd.com

  • Voted 5-0 for $51,209 in shared engineering work to check service-line materials under lead and copper rules.

    April 22, 2024Supports Environment and Public Health

    Source: etwd.com

Track record — Government Efficiency

Government Efficiency · 6 support
  • Voted 5-0 to adopt an artificial intelligence policy encouraging useful tools while setting safeguards for data security and daily operations.

    July 23, 2026Supports Government Efficiency

    Source: etwd.com

  • Proposed adopting the 2025 Urban Water Management Plan and supported the updated shortage plan and enforcement ordinance. Each measure passed 5-0. The shortage plan covered emergency responses, monitoring, communication, and enforcement.

    June 25, 2026Supports Government Efficiency

    Source: etwd.com

  • Voted 5-0 to adopt the district’s 2026-2030 Strategic Plan. Its objectives included cash reserves covering 180 days of operating costs, asset management plans for water pipelines and pressurized sewer lines, and a cybersecurity incident response plan.

    November 25, 2025Supports Government Efficiency

    Source: etwd.com

  • Voted 5-0 to support AB 259. The bill removed the expiration date for rules allowing board members to join meetings remotely for emergencies or just cause.

    March 27, 2025Supports Government Efficiency

    Source: etwd.com

  • Voted 5-0 for a new business management software system. The contracts covered a $42,910.65 annual subscription and $130,133 for implementation and training.

    August 26, 2021Supports Government Efficiency

    Source: etwd.com

  • Voted 5-0 to oppose SB 204 unless amended, objecting to added legislative steps for Delta water project permits.

    February 28, 2019Supports Government Efficiency

    Source: etwd.com

Track record — Cost of Living Reduction

Cost of Living Reduction · 1 support · 1 oppose
  • Proposed higher water, sewer, and recycled water charges effective July 1, 2026. The 5-0 vote included a 23-cent increase per billing unit of recycled water.

    June 11, 2026Opposes Cost of Living Reduction

    Source: etwd.com

  • Voted 5-0 to support AB 533’s income tax exemption for water-saving and stormwater rebates.

    February 28, 2019Supports Cost of Living Reduction

    Source: etwd.com

Track record — Government Spending Reduction

Government Spending Reduction · 3 support · 7 oppose
  • Seconded and supported the district’s 2026-2027 operating and capital budget, which allocated $32,353,172 for operating and maintenance costs and authorized 58 full-time-equivalent positions. It passed 5-0.

    April 20, 2026Opposes Government Spending Reduction

    Source: etwd.com

  • Voted 5-0 to support SB 454’s statewide fund addressing PFAS contamination in water and wastewater systems. The vote also backed a coalition letter.

    March 27, 2025Opposes Government Spending Reduction

    Source: etwd.com

  • Voted to raise directors’ daily pay from $219 to $240.90. The increase passed 4-1.

    February 27, 2025Opposes Government Spending Reduction

    Source: etwd.com

  • Voted for the district’s 2024-2025 operating and capital budget option using a 3.9% inflation figure. It passed 4-1, with Gaskins voting yes.

    April 22, 2024Opposes Government Spending Reduction

    Source: etwd.com

  • Voted 5-0 to remove long-term care insurance from directors’ benefits while updating district policies.

    February 20, 2024Supports Government Spending Reduction

    Source: etwd.com

  • Seconded and supported the district’s 2023-2024 operating and capital budget, which budgeted a 7.1% inflation component and a typical 3% merit component for employee pay. The budget passed 5-0.

    May 3, 2023Opposes Government Spending Reduction

    Source: etwd.com

  • Proposed authorizing up to $50 million in water and wastewater revenue bonds. The Financing Authority approved the sale and related documents 4-0, with one director absent.

    February 14, 2022Opposes Government Spending Reduction

    Source: etwd.com

  • Voted 5-0 for a debt policy that barred borrowing for operating costs or minor routine repairs and replacements.

    January 24, 2022Supports Government Spending Reduction

    Source: etwd.com

  • Proposed and supported the district’s 2020-2021 operating budget after backing a reduction of its inflation allowance from 3.2% to 2.2%. The budget passed 5-0.

    June 22, 2020Supports Government Spending Reduction

    Source: etwd.com

  • Proposed and supported a letter seeking $21,693,203 in state aid for Paradise Irrigation District after the Camp Fire. The motion passed 4-0.

    March 28, 2019Opposes Government Spending Reduction

    Source: etwd.com

Track record — Public Infrastructure

Public Infrastructure · 14 support
  • Voted 5-0 to adopt the district’s 2026-2030 Strategic Plan. Its objectives included cash reserves covering 180 days of operating costs, asset management plans for water pipelines and pressurized sewer lines, and a cybersecurity incident response plan.

    November 25, 2025Supports Public Infrastructure

    Source: etwd.com

  • Voted 5-0 to renew a sewer service agreement covering two Mission Viejo streets for another 50 years. Moulton Niguel Water District handled the wastewater because of the land’s slope.

    October 23, 2025Supports Public Infrastructure

    Source: etwd.com

  • Seconded and supported committing a 25% local funding match for an Aliso Creek Lift Station protection grant application. The motion passed 5-0.

    August 25, 2025Supports Public Infrastructure

    Source: etwd.com

  • Voted 5-0 for a $10,424,200 construction contract to repair wastewater intake equipment and a settling tank. The same vote approved $943,904 for construction oversight, $546,328 for engineering, and $103,433 for programming.

    June 23, 2025Supports Public Infrastructure

    Source: etwd.com

  • Voted 5-0 to grant Laguna Woods a conditional access easement for a fire station and public safety building. The easement crossed the P-1 Pump Station access road.

    December 19, 2024Supports Public Infrastructure

    Source: etwd.com

  • Voted 5-0 to authorize a federal grant application for studying direct introduction of treated wastewater into the drinking water system, with a 50% local cost share largely in staff time.

    October 23, 2023Supports Public Infrastructure

    Source: etwd.com

  • Proposed $1,031,648 for R-6 Reservoir perimeter road repairs and $34,663 for testing during construction. The board approved both contracts 4-0.

    September 25, 2023Supports Public Infrastructure

    Source: etwd.com

  • Proposed a $2,184,000 warehouse construction contract and $222,095 for engineering after rejecting an incomplete lower bid. The motion passed 4-1.

    May 22, 2023Supports Public Infrastructure

    Source: etwd.com

  • Proposed accepting Irvine Ranch Water District’s capacity in a wastewater transmission main and the Aliso Creek Ocean Outfall. The agreement passed 5-0.

    November 22, 2022Supports Public Infrastructure

    Source: etwd.com

  • Proposed a $23,608,825 construction contract to replace R-6 Reservoir’s floating cover and liner. The 5-0 vote also approved $499,088 for engineering and construction management, plus $372,100 for inspections.

    July 25, 2022Supports Public Infrastructure

    Source: etwd.com

  • Voted 5-0 for a $1,954,236 construction contract to improve Oso Lift Station, plus $84,000 in engineering services. Approval depended on obtaining the city permit.

    June 22, 2020Supports Public Infrastructure

    Source: etwd.com

  • Voted 5-0 for an emergency sewer overflow connection with Moulton Niguel Water District during Oso Lift Station construction.

    October 22, 2019Supports Public Infrastructure

    Source: etwd.com

  • Seconded and supported state funding access for the Doheny ocean desalination project under AB 1752. The motion passed 5-0.

    June 25, 2019Supports Public Infrastructure

    Source: etwd.com

  • Proposed and supported a letter seeking $21,693,203 in state aid for Paradise Irrigation District after the Camp Fire. The motion passed 4-0.

    March 28, 2019Supports Public Infrastructure

    Source: etwd.com

Track record — General

General · 36 records
  • Worked as a water quality chemist and microbiologist for Santa Margarita Water District.

    November 1, 2026

    Source: etwd.com

  • Worked as a science teacher for Capistrano Unified School District.

    November 1, 2026

    Source: etwd.com

  • Served as human resources director for the City of Montebello.

    November 1, 2026

    Source: etwd.com

  • Served in Vietnam as an Army sergeant.

    November 1, 2026

    Source: etwd.com

  • Spent 18 years negotiating public-sector labor agreements with employee associations across Southern California.

    November 1, 2026

    Source: etwd.com

  • Was recommended in OC Indivisible Coalition’s guide for the 2026 general election.

    October 6, 2026

    Source: ocindivisible.org

  • Proposed a shared-facilities agreement for the Joint Regional Water Supply System. The agreement allocated systemwide costs; El Toro held 0.23% of capacity. The motion passed 5-0.

    September 24, 2026

    Source: etwd.com

  • Voted 5-0 to adopt residential water shutoff rules requiring a bill at least 60 days overdue and 10 business days’ mailed notice before a shutoff. The rules protected customers during timely bill appeals and while following approved payment plans.

    August 27, 2026

    Source: etwd.com

  • Seconded and supported raising minimum cash reserve targets to stay above 7.5% of operating costs. The change passed 5-0.

    August 24, 2026

    Source: etwd.com

  • Seconded and supported further negotiations to acquire the wastewater transmission main from SOCWA for district ownership and operation. The motion passed 5-0.

    July 23, 2026

    Source: etwd.com

  • Voted 5-0 to let Laguna Woods install and maintain a surveillance camera at Oso Lift Station. The agreement allowed a view of the station and Woods End Wilderness Preserve entrance.

    May 28, 2026

    Source: etwd.com

  • Voted against a six-month public affairs contract at $4,000 monthly, with costs divided among six agencies. It passed 5-1. He supported a revised split excluding El Toro, which passed 6-0.

    March 5, 2026

    Source: socwa.com

  • Proposed $69,500 in added consulting work for solar and battery contract negotiations. The motion passed 4-1.

    February 23, 2026

    Source: etwd.com

  • Supported a 5% base salary increase and a 15% performance award for General Manager Dennis Cafferty. He seconded the final amendment setting the effective pay period in December 2025. The motion passed 5-0.

    November 25, 2025

    Source: etwd.com

  • As El Toro’s SOCWA alternate director, opposed splitting $50,000 in Ocean Institute collaboration costs equally among six agencies. The five-year arrangement passed 5-1.

    November 6, 2025

    Source: socwa.com

  • Voted 5-0 for an ordinance setting the process for customers to challenge new district rates and charges under AB 2257.

    April 10, 2025

    Source: etwd.com

  • Voted 5-0 to oppose SB 350’s water bill aid program for low-income residents unless amended. The board also authorized joining coalition letters seeking changes.

    March 27, 2025

    Source: etwd.com

  • Served as chair of the El Toro Water District Financing Authority while serving as district board president. The authority confirmed the board members and officer roles in a 5-0 vote.

    January 23, 2025

    Source: etwd.com

  • Voted 5-0 to raise the fee for wastewater system capacity from $9.31 to $10.66 per gallon of daily flow.

    December 19, 2024

    Source: etwd.com

  • Seconded and supported investing up to $1,256,000 in a water prepayment program for up to 1,000 acre-feet. The 5-0 vote authorized participation through the Municipal Water District of Orange County.

    December 16, 2024

    Source: etwd.com

  • Voted to raise the general manager’s purchasing authority to $75,000. The policy change passed 4-1.

    August 22, 2024

    Source: etwd.com

  • Was appointed El Toro Water District’s primary representative at the ACWA Joint Powers Insurance Authority. The board approved the assignment 5-0.

    July 25, 2024

    Source: etwd.com

  • Voted 5-0 to seek congressional support for protecting water agencies from certain lawsuits over PFAS contamination. The letter backed the Water Systems PFAS Liability Protection Act (H.R. 7944).

    June 27, 2024

    Source: etwd.com

  • Seconded and supported allowing cloud-seeding equipment at R-6 Reservoir through an agreement with regional partners. The motion passed 5-0.

    July 24, 2023

    Source: etwd.com

  • Seconded and supported ending the Level 2 water shortage declaration after wet weather improved supplies. The 5-0 vote kept permanent water-saving rules in place.

    May 25, 2023

    Source: etwd.com

  • Voted 5-0 to extend COVID-19 emergency leave authority through February 23, 2023. The manager received discretion to grant up to 160 hours per employee each month.

    November 22, 2022

    Source: etwd.com

  • Voted 5-0 for a $685,000 contract to demolish the filter building and clear-water storage tank. The same vote approved $124,429 in engineering services.

    July 25, 2022

    Source: etwd.com

  • Proposed creating the El Toro Water District Financing Authority through an agreement with a statewide public financing agency. The board approved it 5-0.

    January 24, 2022

    Source: etwd.com

  • Voted 5-0 to reaffirm priority service for affordable housing projects, as required by state law.

    July 22, 2021

    Source: etwd.com

  • Seconded and supported temporarily raising authorized staffing from 60 to 61 employees during a succession transition. The change to the 2020-2021 budget’s staffing limit passed 5-0.

    October 19, 2020

    Source: etwd.com

  • Voted 5-0 to accept a water supply study for the Village at Laguna Hills redevelopment. The study found supplies adequate for the project over 20 years.

    April 20, 2020

    Source: etwd.com

  • Proposed $10 million in dam-failure insurance for R-6 Reservoir and $5 million for the effluent holding pond. The 5-0 vote selected an annual premium of $23,949.

    November 25, 2019

    Source: etwd.com

  • Proposed appointing Dennis Cafferty as general manager at an annual salary of $247,000. The three-year employment agreement passed 5-0.

    June 25, 2019

    Source: etwd.com

  • Seconded and supported creating a standing Water Quality Committee. The board approved it 5-0.

    May 21, 2019

    Source: etwd.com

  • Seconded and supported opposition to SB 332’s required cuts in treated wastewater discharges to oceans and similar waters. The bill set cuts of 50% by 2030 and 95% by 2040. The motion passed unanimously.

    March 28, 2019

    Source: etwd.com

  • Voted 4-0 to support local control over retention periods for surveillance recordings under AB 510.

    March 28, 2019

    Source: etwd.com

Past race Mike Gaskins ran in: